5.9 Using the stock bolts removed in step
72 install the new coolant vent pipe
supplied. Ensure that the o-ring seals are
installed correctly. Torque the bolts with a
torque wrench and 10mm socket to 106 lb-
in.
60. Using the supplied 3/8” hose, connect
a 15” length to the PCV valve as shown and
lay the other end of the hose off to the
drivers side, out of the way. (To be
connected in a later step.)
58. Here is what your finished alternator
mount should look like.
57. On the back surface of the alternator
mount, remove the shaded area as shown.
Page 18
2003-2004 Chevy SSR Supercharger Installation Instructions
Comments to this Manuals