Chevrolet SSR 2004 Installation Manual Page 42

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 41
156 Remove the black tape and split loom
from the MAF connector and wires. Pull the
connector and wires back the point where
the coil pack connector branch is located.
.
Left Coil
pack
connector
MAF
connector
154 Remove the wiring harness mounting
bracket from the harness .
.
155 Locate the MAF connector on the
wiring harness. The MAF connector is
located at the front of the passenger side
(right) branch that supplies the fuel injectors
and ETC and AC.
.
MAF
AC
ETC
Inj
#2
Inj
#4
The following steps describe modifications
to the wiring harness necessary to install
the supercharger. Additional diagrams are
located in the back of this instruction
manual showing these modifications.
1.53 Locate the
the
original GM belt routing diagram.
GM factory-warning and
belt routing diagram stickers on the
radiator apron. Install the RADIX SSR
Vacuum Routing Diagram over the GM
vacuum diagram portion of the sticker.
Install the Radix Intercooler/belt routing
information sticker completely over
7/12
Page 42
2003-2004 Chevy SSR Supercharger Installation Instructions
magnacharger.com
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 55 56

Comments to this Manuals

No comments