Chevrolet SSR 2004 Installation Manual Page 38

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 37
1 . Here is the intercooler pump,
mounting clamp, hardware, wiring and
reservoir to hose.
38
pump
140. From underneath the vehicle on the
right side locate the elongated hole.
Approximately 1” back from the hole drill a
1/4” hole to mount the pump. Place the
mounting clamp around the pump body and
then pass the new 6 x 20mm bolt through
the pump mounting clamp and then through
the hole. Secure the bolt with the new nut
and tighten securely with a 10mm wrench.
Pump
1 . The intercooler pump will mount in the
engine compartment next
to the battery cable junction box. Note he
elongated hole in the panel.
39
right side of the
:T
Junction box
Pump
Hole
Mounting bolt
and clamp
137. Removing the molded foam block
creates a opening between the radiator and
the fender well for the intercooler coolant
lines to pass. The line from the pump to the
heat exchanger and from the heat
exchanger to the coolant manifold will pass
through this opening.
Intercooler lines
pass through here
7/12
Page 38
2003-2004 Chevy SSR Supercharger Installation Instructions
magnacharger.com
Page view 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 55 56

Comments to this Manuals

No comments